500 MW pumped storage project in Badeo, Kibungan, Philippines. The hydro project is situated on the Kibungan mountains, which are 8,202 ft tall, ideal topography for a pumped storage project.
PPA with Local Utility, Meralco. Meralco has a monopoly over the power distribution around Manila
Spot Market: Procure electricity for pumping at an off-peak rate